ITAC Assessment: MS0233
ITAC logo
ITAC Assessment: MS0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Industrial boilers
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 530
Plant Area 550,000
ft2
Annual Production 146
pieces
Production Hrs. Annual 2,880
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,420 8,260,800
kWh
Electricity Demand $214,865 24,059
kW-mo/yr
Electricity Fees $26,330 -
Natural Gas $351,886 44,132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $322,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $253,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.4222: Install adequate dryers on air lines to eliminate blowdown $200,928 $9,650 $205
6,881
kWh
$(-73.0)
-
kW-mo/yr
$2 - - $200,794
02 2.2442: Preheat combustion air with waste heat $67,762 $79,500 - - - $67,762
-
MMBtu
- -
03 2.3212: Optimize plant power factor $19,274 $21,420 - - $19,274 - - -
04 2.4322: Use or replace with energy efficient substitutes $12,291 $36,800 $4,996
167,491
kWh
$7,113
-
kW-mo/yr
$182 - - -
05 2.7261: Install timers and/or thermostats $11,372 $2,900 - - - $11,372
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,999 $748 $4,925
165,114
kWh
- $74 - - -
07 2.4314: Use synthetic lubricant $3,787 $1,210 $1,117
37,464
kWh
$2,018
-
kW-mo/yr
$47 - $605
-
gal
-
08 2.7261: Install timers and/or thermostats $1,622 $1,535 $1,598
53,571
kWh
- $24 - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $579 $968 $234
7,858
kWh
$336
-
kW-mo/yr
$9 - - -
TOTAL RECOMMENDED $322,614 $154,731 $13,075
438,379
kWh
$9,394
-
kW-mo/yr
$19,612 $79,134
-
MMBtu
$605
-
gal
$200,794
TOTAL IMPLEMENTED $253,230 $73,696 $11,477
384,808
kWh
$9,394
-
kW-mo/yr
$19,588 $11,372
-
MMBtu
$605
-
gal
$200,794
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs