Assessment Year | 2013 |
---|---|
Principal Product | dehydrated onion products |
NAICS | 311423: Dried and Dehydrated Food Manufacturing |
SIC | 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
1,500,000
ft2
|
Annual Production | 30
units
|
Production Hrs. Annual | 3,864
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $475,934 | 6,774,228 |
kWh
|
$0.070 |
Electricity Demand | $268,632 | 18,157 |
kW-mo/yr
|
$14.79 |
Natural Gas | $1,572,011 | 312,816 |
MMBtu
|
$5.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $135,765 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $104,481 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $6,789 | - |
$3,808
54,170
kWh
|
- | - |
$2,981
-
MMBtu
|
- | |
02 | 2.5123: Reduce fluid flow rates | $17,815 | - |
$12,965
184,421
kWh
|
$4,850
-
kW-mo/yr
|
- | - | - | |
03 | 2.2121: Increase amount of condensate returned | $10,307 | - | - | - | - |
$10,307
-
MMBtu
|
- | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $2,404 | $1,224 |
$2,404
34,200
kWh
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,537 | $3,594 |
$2,667
37,491
kWh
|
$870
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $7,962 | $46,705 |
$6,090
86,635
kWh
|
$1,872
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $79,423 | $291,716 |
$60,269
857,308
kWh
|
$17,966
-
kW-mo/yr
|
- | - | $1,188 | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,020 | $4,007 |
$1,020
14,514
kWh
|
- | - | - | - | |
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,508 | $26,000 | - | - | $6,508 | - | - | |
TOTAL RECOMMENDED | $135,765 | $373,246 |
$89,223
1,268,739
kWh
|
$25,558
-
kW-mo/yr
|
$6,508 |
$13,288
-
MMBtu
|
$1,188 | ||
TOTAL IMPLEMENTED | $104,481 | $338,421 |
$70,167
998,113
kWh
|
$19,838
-
kW-mo/yr
|
- |
$13,288
-
MMBtu
|
$1,188 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs