ITAC Assessment: SF0424
ITAC logo
ITAC Assessment: SF0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product dehydrated onion products
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 1,500,000
ft2
Annual Production 30
units
Production Hrs. Annual 3,864
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $475,934 6,774,228
kWh
Electricity Demand $268,632 18,157
kW-mo/yr
Natural Gas $1,572,011 312,816
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,481

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $6,789 - $3,808
54,170
kWh
- - $2,981
-
MMBtu
-
02 2.5123: Reduce fluid flow rates $17,815 - $12,965
184,421
kWh
$4,850
-
kW-mo/yr
- - -
03 2.2121: Increase amount of condensate returned $10,307 - - - - $10,307
-
MMBtu
-
04 2.6231: Utilize controls to operate equipment only when needed $2,404 $1,224 $2,404
34,200
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,537 $3,594 $2,667
37,491
kWh
$870
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $7,962 $46,705 $6,090
86,635
kWh
$1,872
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $79,423 $291,716 $60,269
857,308
kWh
$17,966
-
kW-mo/yr
- - $1,188
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,020 $4,007 $1,020
14,514
kWh
- - - -
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,508 $26,000 - - $6,508 - -
TOTAL RECOMMENDED $135,765 $373,246 $89,223
1,268,739
kWh
$25,558
-
kW-mo/yr
$6,508 $13,288
-
MMBtu
$1,188
TOTAL IMPLEMENTED $104,481 $338,421 $70,167
998,113
kWh
$19,838
-
kW-mo/yr
- $13,288
-
MMBtu
$1,188
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs