| Assessment Year | 2022 |
|---|---|
| Principal Product | Plants |
| NAICS | 311999: All Other Miscellaneous Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
219,200
ft2
|
| Annual Production | 10,000,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $61,151 | 936,720 |
kWh
|
$0.065 |
| Electricity Demand | $46,598 | 3,906 |
kW-mo/yr
|
$11.93 |
| Electricity Fees | $12,206 | - |
|
- |
| Fuel Oil #2 | $1,805 | 77 |
MMBtu
|
$23.44 |
| TOTAL YEARLY COSTS | $121,760 | |||
| RECOMMENDED SAVINGS* | $37,936 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,018 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $11,438 | $580 |
$9,136
140,551
kWh
|
$2,302
-
kW-mo/yr
|
- | |
| 02 | 2.6218: Turn off equipment when not in use | $7,151 | $7,280 |
$5,719
87,984
kWh
|
$1,432
-
kW-mo/yr
|
- | |
| 03 | 2.3192: Use fossil fuel powered generator during peak demand periods | $5,890 | $80 | - | - | $5,890 | |
| 04 | 2.9112: Use solar heat to heat water | $3,955 | $18,399 |
$3,955
60,842
kWh
|
- | - | |
| 05 | 2.4313: Provide proper maintenance of motor driven equipment | $3,575 | $597 |
$2,859
43,992
kWh
|
$716
-
kW-mo/yr
|
- | |
| 06 | 2.6218: Turn off equipment when not in use | $2,493 | $140 |
$2,493
38,359
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,361 | $10,695 |
$1,216
18,711
kWh
|
$1,145
-
kW-mo/yr
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,073 | $2,150 |
$858
13,198
kWh
|
$215
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $37,936 | $39,921 |
$26,236
403,637
kWh
|
$5,810
-
kW-mo/yr
|
$5,890 | ||
| TOTAL IMPLEMENTED | $27,018 | $19,292 |
$21,423
329,597
kWh
|
$5,595
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs