| Assessment Year | 2003 |
|---|---|
| Principal Product | Asphalt |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2952: Asphalt Felts and Coatings |
| Sales Range | $10 M to 50M |
| # of Employees | 13 |
| Plant Area |
188,250
ft2
|
| Annual Production | 140,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $351,593 | 6,867,360 |
kWh
|
$0.051 |
| Electricity Demand | $91,352 | 14,054 |
kW-mo/yr
|
$6.50 |
| Natural Gas | $621,748 | 154,195 |
MMBtu
|
$4.03 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,885 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,755 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,075 | $1,000 | - | - |
$2,075
-
MMBtu
|
|
| 02 | 2.2135: Repair and eliminate steam leaks | $7,772 | $1,200 | - | - |
$7,772
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $279 | $24 |
$200
5,242
kWh
|
$79
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $504 | $129 |
$359
9,435
kWh
|
$145
-
kW-mo/yr
|
- | |
| 05 | 2.2511: Insulate bare equipment | $3,809 | $673 | - | - |
$3,809
-
MMBtu
|
|
| 06 | 2.4133: Use most efficient type of electric motors | $1,079 | $163 |
$773
20,292
kWh
|
$306
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $321 | $552 |
$120
3,162
kWh
|
$201
-
kW-mo/yr
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $46 | $62 |
$17
457
kWh
|
$29
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $15,885 | $3,803 |
$1,469
38,588
kWh
|
$760
-
kW-mo/yr
|
$13,656
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,755 | $2,578 |
$1,349
35,426
kWh
|
$559
-
kW-mo/yr
|
$9,847
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs