Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 13
Plant Area 188,250
ft2
Annual Production 140,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $351,593 6,867,360
kWh
Electricity Demand $91,352 14,054
kW-mo/yr
Natural Gas $621,748 154,195
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,755

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,075 $1,000 - - $2,075
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $7,772 $1,200 - - $7,772
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $279 $24 $200
5,242
kWh
$79
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $504 $129 $359
9,435
kWh
$145
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $3,809 $673 - - $3,809
-
MMBtu
06 2.4133: Use most efficient type of electric motors $1,079 $163 $773
20,292
kWh
$306
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $321 $552 $120
3,162
kWh
$201
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $46 $62 $17
457
kWh
$29
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,885 $3,803 $1,469
38,588
kWh
$760
-
kW-mo/yr
$13,656
-
MMBtu
TOTAL IMPLEMENTED $11,755 $2,578 $1,349
35,426
kWh
$559
-
kW-mo/yr
$9,847
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs