Assessment Year | 2003 |
---|---|
Principal Product | Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 13 |
Plant Area |
188,250
ft2
|
Annual Production | 140,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $351,593 | 6,867,360 |
kWh
|
$0.051 |
Electricity Demand | $91,352 | 14,054 |
kW-mo/yr
|
$6.50 |
Natural Gas | $621,748 | 154,195 |
MMBtu
|
$4.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,885 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,755 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,075 | $1,000 | - | - |
$2,075
-
MMBtu
|
|
02 | 2.2135: Repair and eliminate steam leaks | $7,772 | $1,200 | - | - |
$7,772
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $279 | $24 |
$200
5,242
kWh
|
$79
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $504 | $129 |
$359
9,435
kWh
|
$145
-
kW-mo/yr
|
- | |
05 | 2.2511: Insulate bare equipment | $3,809 | $673 | - | - |
$3,809
-
MMBtu
|
|
06 | 2.4133: Use most efficient type of electric motors | $1,079 | $163 |
$773
20,292
kWh
|
$306
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $321 | $552 |
$120
3,162
kWh
|
$201
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $46 | $62 |
$17
457
kWh
|
$29
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $15,885 | $3,803 |
$1,469
38,588
kWh
|
$760
-
kW-mo/yr
|
$13,656
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,755 | $2,578 |
$1,349
35,426
kWh
|
$559
-
kW-mo/yr
|
$9,847
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs