ITAC Assessment: NV0036
ITAC logo
ITAC Assessment: NV0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Breakfast Cereals
NAICS
n/a
SIC 2043: Cereal Breakfast Foods
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 237,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,003,539 15,445,487
kWh
Natural Gas $452,041 105,743
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $368,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,482

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,062 $4,800 $10,062
219,812
kWh
-
02 2.2136: Install / repair insulation on steam lines $817 $320 - $817
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $420 - $420
9,086
kWh
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $8,102 $62,000 - $8,102
-
MMBtu
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $348,971 $3,100,000 $452,041
9,778,722
kWh
$(-103,070.0)
-
MMBtu
TOTAL RECOMMENDED $368,372 $3,167,120 $462,523
10,007,620
kWh
$(-94,151.0)
-
MMBtu
TOTAL IMPLEMENTED $10,482 $4,800 $10,482
228,898
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs