ITAC Assessment: OR0054
ITAC logo
ITAC Assessment: OR0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product BREADS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 360
Plant Area
n/a
Annual Production 46,600,000
lb
Production Hrs. Annual 6,126
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,381 3,712,778
kWh
Natural Gas $151,495 36,419
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,524

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,028 $1,000 - $3,028
-
MMBtu
-
02 2.2441: Preheat boiler makeup water with waste process heat $1,259 $1,525 - $1,498
-
MMBtu
$(-239.0)
03 2.4133: Use most efficient type of electric motors $147 $206 $147
6,155
kWh
- -
04 2.1213: Direct warmest air to combustion intake $349 $900 - $349
-
MMBtu
-
TOTAL RECOMMENDED $4,783 $3,631 $147
6,155
kWh
$4,875
-
MMBtu
$(-239.0)
TOTAL IMPLEMENTED $3,524 $2,106 $147
6,155
kWh
$3,377
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs