ITAC Assessment: LE0169
ITAC logo
ITAC Assessment: LE0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Extruded Plastic Tubing
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 48,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,134 1,027,296
kWh
Electricity Demand $27,162 2,727
kW-mo/yr
Natural Gas $20,270 1,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,797

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,674 $1,050 $1,674
31,768
kWh
- -
02 2.7261: Install timers and/or thermostats $2,194 $1,250 - - $2,194
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,635 $1,000 $1,150
21,825
kWh
$485
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,067 - $795
15,082
kWh
$272
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $862 $119 $862
16,358
kWh
- -
06 2.7135: Install occupancy sensors $1,034 $675 $1,034
19,618
kWh
- -
TOTAL RECOMMENDED $8,466 $4,094 $5,515
104,651
kWh
$757
-
kW-mo/yr
$2,194
-
MMBtu
TOTAL IMPLEMENTED $5,797 $2,419 $3,331
63,208
kWh
$272
-
kW-mo/yr
$2,194
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs