Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
825 matching assessments
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated structural metal products
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
SU0610 2026 Boilers 14 $303k $60k
NL0143 2026 Industrial boilers 7 $319k $694k
IP0224 2026 Metal fabrication 4 $110k $9.7k
GT1014 2026 Hvac air distribution 6 $577k $452k
OK1175 2026 Sheet metal hvac equipment 5 $112k $16k
WM0262 2026 Metal tanks, food processing equipment 5 $371k $7.5k
DL0274 2026 Metal framing components 11 $233k $47k
DL0273 2026 Metal frame products 5 $384k $107k
NT0063 2026 Structural steel 6 $312k $417k
UC2605 2026 Cold-formed steel framing 9 $705k $76k
OK1168 2026 Architectural & security fencing 10 $2,931k $438k
UF0647 2026 Sheet metal enclosures 12 $451k $432k
UD1133 2026 Pressure vessels 9 $2,266k $135k
UC2604 2026 Metal fabrication and custom-built products 4 $347k $1,884k
UD1132 2026 Cylinders 5 $1,254k $50k
NT0061 2026 Steel framing 7 $291k $403k
WM0259 2026 Heat exchangers 5 $1,928k $207k
AM0981 2026 Custom metal enclosures 7 $102k $49k
LT8442 2026 S.e.t (surface enhancement technology) wear materials 4 $66k $76k
UU0295 2026 Fabricated structural and architectural metal 7 $130k $538k