ITAC Assessment: WM0262
ITAC logo
ITAC Assessment: WM0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Metal Tanks, Food Processing Equipment
NAICS 333241: Food Product Machinery Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 230,000
ft2
Annual Production 4,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,545 2,196,950
kWh
Electricity Demand $110,397 6,477
kW-mo/yr
Electricity Fees $53,096 -
Natural Gas $87,499 25,896
MMBtu
Waste Disposal Costs
Water Usage $17,718 1,198
Tgal
TOTAL YEARLY COSTS $388,255
RECOMMENDED SAVINGS* $7,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7224: Reduce space conditioning during non-working hours $3,641 - $2,547
47,163
kWh
$1,094
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $1,350 - $1,350
25,000
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $890 $450 $578
10,695
kWh
$312
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $472 - $148
2,740
kWh
$324
-
kW-mo/yr
05 2.4221: Install compressor air intakes in coolest locations $659 $2,429 $460
8,510
kWh
$199
-
kW-mo/yr
TOTAL RECOMMENDED $7,012 $2,879 $5,082
94,108
kWh
$1,930
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs