Assessment Year | 1990 |
---|---|
Principal Product | WOOD HOUSEHOLD FURNITURE |
NAICS |
n/a
|
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
n/a
|
Annual Production | 22,800
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,293 | 4,093,787 |
kWh
|
$0.048 |
Fuel Oil #2 | $13,621 | 2,354 |
MMBtu
|
$5.79 |
Fuel Oil #4 | $64,856 | 18,667 |
MMBtu
|
$3.47 |
Wood | $12,546 | 15,414 |
MMBtu
|
$0.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,800 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,354 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.6123: Burn wood by-products for heat | $15,125 | $58,640 | - |
$18,130
-
MMBtu
|
$(-3,005.0)
-
MMBtu
|
- | |
02 | 2.2153: Close off unneeded steam lines | $3,385 | - | - |
$3,183
-
MMBtu
|
$202
-
MMBtu
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $2,853 | $770 | - |
$2,701
-
MMBtu
|
$152
-
MMBtu
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $2,117 | $30,000 | - |
$2,004
-
MMBtu
|
$113
-
MMBtu
|
- | |
05 | 2.7123: Keep lamps and reflectors clean | $9,859 | $28,302 |
$8,849
184,349
kWh
|
- | - | $1,010 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,021 | $1,140 |
$6,021
125,440
kWh
|
- | - | - | |
07 | 2.2122: Install / repair insulation on condensate lines | $978 | $200 | - |
$926
-
MMBtu
|
$52
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,039 | $4,000 |
$3,039
63,306
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,423 | $1,230 |
$1,423
29,601
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $44,800 | $124,282 |
$19,332
402,696
kWh
|
$26,944
-
MMBtu
|
$(-2,486.0)
-
MMBtu
|
$1,010 | ||
TOTAL IMPLEMENTED | $15,354 | $32,110 |
$6,021
125,440
kWh
|
$8,814
-
MMBtu
|
$519
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs