ITAC Assessment: GT1014
ITAC logo
ITAC Assessment: GT1014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product HVAC Air Distribution
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $100
M
to 500
M
# of Employees 378
Plant Area 175,000
ft2
Annual Production 1,294,389
units
Production Hrs. Annual 5,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $444,491 4,868,727
kWh
Natural Gas $132,278 28,064
MMBtu
TOTAL YEARLY COSTS $576,769
RECOMMENDED SAVINGS* $451,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $23,097 $1,850 $25,997
285,681
kWh
- $(-2,900.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,184 $100 $1,184
13,008
kWh
- -
03 2.6211: Conserve energy by efficient use of vending machines $158 $180 $158
1,733
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,377 $24,000 $8,377
92,056
kWh
- -
05 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $241,109 $1,035,000 $295,750
3,250,000
kWh
$(-54,641.0)
-
MMBtu
-
06 2.9114: Use solar heat to make electricty $178,027 $1,244,837 $178,027
1,950,023
kWh
- -
TOTAL RECOMMENDED $451,952 $2,305,967 $509,493
5,592,501
kWh
$(-54,641.0)
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs