ITAC Assessment: UC2604
ITAC logo
ITAC Assessment: UC2604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Metal fabrication and custom-built products
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $100
M
to 500
M
# of Employees 55
Plant Area 1,200,000
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 3,325
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,144 1,025,533
kWh
Electricity Demand $64,640 4,541
kW-mo/yr
Electricity Fees $4,987 -
Natural Gas $79,792 5,328
MMBtu
TOTAL YEARLY COSTS $346,563
RECOMMENDED SAVINGS* $1,884,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $345,157 $439,310 $29,405
152,992
kWh
$(-4,248.0)
-
kW-mo/yr
$320,000 -
02 2.4322: Use or replace with energy efficient substitutes $1,287,381 $759,420 $151,623
788,882
kWh
$2,358
-
kW-mo/yr
$973,400 $160,000
03 2.4131: Size electric motors for peak operating efficiency $238,904 $210,657 $13,776
71,677
kWh
$128
-
kW-mo/yr
$225,000 -
04 2.4239: Eliminate or reduce compressed air usage $12,718 $245,025 $10,550
54,900
kWh
$2,168
-
kW-mo/yr
- -
TOTAL RECOMMENDED $1,884,160 $1,654,412 $205,354
1,068,451
kWh
$406
-
kW-mo/yr
$1,518,400 $160,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs