ITAC Assessment: AM0541
ITAC logo
ITAC Assessment: AM0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Rubber bonded products
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 38
Plant Area 45,000
ft2
Annual Production 51,500
lb
Production Hrs. Annual 2,404
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,636 944,000
kWh
Electricity Demand $23,244 4,800
kW-mo/yr
Electricity Fees $3,000 -
Natural Gas $41,772 1,842
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,883

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $5,730 $500 - - $5,730
-
MMBtu
02 2.7145: Install skylights $2,160 $4,300 $2,160
20,550
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $900 $13 $710
6,750
kWh
$190
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $595 $275 $470
4,450
kWh
$125
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $395 $840 - - $395
-
MMBtu
06 2.4314: Use synthetic lubricant $163 - $130
1,265
kWh
$33
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,943 $5,928 $3,470
33,015
kWh
$348
-
kW-mo/yr
$6,125
-
MMBtu
TOTAL IMPLEMENTED $6,883 $1,615 $600
5,715
kWh
$158
-
kW-mo/yr
$6,125
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs