ITAC Assessment: NL0143
ITAC logo
ITAC Assessment: NL0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Industrial Boilers
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 200,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,941 1,718,319
kWh
Electricity Demand $134,234 5,931
kW-mo/yr
Electricity Fees $20,371 -
Natural Gas $118,526 13,826
MMBtu
Other Gas $2,024 1
MMBtu
Waste Disposal Costs
Water Usage $2,982 962
Tgal
Water Disposal $3,474 962
Tgal
Other Liquid (non-haz) $3,101 1
gal
TOTAL YEARLY COSTS $328,653
RECOMMENDED SAVINGS* $694,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4321: Upgrade obsolete equipment $431,484 $274,750 $234
9,000
kWh
- $431,250 -
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $104,880 $43,894 - - $104,880 -
03 4.211: Consider use / purchase of bulk materials where possible $90,400 $300,708 - - $72,220 $18,180
04 2.7492: Use proper thickness of insulation on building envelope $38,419 $169,049 - $38,419
-
MMBtu
- -
05 2.7492: Use proper thickness of insulation on building envelope $19,548 $85,770 - $19,548
-
MMBtu
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $8,763 $9,469 - $8,763
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $891 $500 $1,911
73,500
kWh
- $(-920.0) $(-100.0)
TOTAL RECOMMENDED $694,385 $884,140 $2,145
82,500
kWh
$66,730
-
MMBtu
$607,430 $18,080
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs