ITAC Assessment: UF0647
ITAC logo
ITAC Assessment: UF0647
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Sheet Metal Enclosures
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 240,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,375
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,265 2,308,157
kWh
Electricity Demand $130,444 9,465
kW-mo/yr
Electricity Fees $49,862 -
Natural Gas $122,970 8,457
MMBtu
TOTAL YEARLY COSTS $447,541
RECOMMENDED SAVINGS* $432,364 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $75,479 $250,000 $9,727
154,404
kWh
$10,752
-
kW-mo/yr
- $55,000 - -
02 2.3191: Use demand controller or load shedder $19,310 $12,418 $10,179
161,571
kWh
$9,131
-
kW-mo/yr
- - - -
03 2.7446: Utilize sensors controlling roof and wall openings $8,168 $4,000 $959
15,221
kWh
$1,060
-
kW-mo/yr
$6,149
-
MMBtu
- - -
04 2.2522: Isolate hot or cold equipment $7,455 $28,000 $4,455
70,708
kWh
- - - $3,000 -
05 2.2623: Minimize condenser cooling water temperature $1,056 $2,800 $1,056
16,754
kWh
- - - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $442 - $234
3,710
kWh
- - $99 - $109
07 2.4131: Size electric motors for peak operating efficiency $377 - $377
5,980
kWh
- - - - -
08 2.4237: Substitute compressed air cooling with water or air cooling $369 $900 $369
5,864
kWh
- - - - -
09 4.446: Automate finishing process $242,080 $200,000 $1,822
28,925
kWh
$2,658
-
kW-mo/yr
- $237,600 - -
10 4.126: Install sensors to detect defects $50,000 $85,000 - - - $44,000 $6,000 -
11 4.321: Optimize production lot sizes and inventories $22,000 $4,000 - - - $22,000 - -
12 4.513: Re-arrange equipment layout to reduce labor costs $5,628 $1,368 - - - $2,931 $2,697 -
TOTAL RECOMMENDED $432,364 $588,486 $29,178
463,137
kWh
$23,601
-
kW-mo/yr
$6,149
-
MMBtu
$361,630 $11,697 $109
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs