ITAC Assessment: DL0273
ITAC logo
ITAC Assessment: DL0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Metal frame products
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 92
Plant Area 127,000
ft2
Annual Production 96,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,619 1,508,470
kWh
Electricity Demand $22,292 4,064
kW-mo/yr
Electricity Fees $11,459 -
Natural Gas $78,198 5,433
MMBtu
TOTAL YEARLY COSTS $383,568
RECOMMENDED SAVINGS* $107,065 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $36,047 $247,000 - $36,047
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,416 - $3,416
18,960
kWh
-
03 2.1224: Replace boiler $6,936 $20,000 - $6,936
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $57,406 $206,000 $57,406
318,920
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,260 $3,400 $3,260
18,120
kWh
-
TOTAL RECOMMENDED $107,065 $476,400 $64,082
356,000
kWh
$42,983
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs