| Assessment Year | 2026 |
|---|---|
| Principal Product | Metal frame products |
| NAICS | 332322: Sheet Metal Work Manufacturing |
| SIC | 3444: Sheet Metal Work |
| Sales Range | $50 M to 100M |
| # of Employees | 92 |
| Plant Area |
127,000
ft2
|
| Annual Production | 96,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $271,619 | 1,508,470 |
kWh
|
$0.18 |
| Electricity Demand | $22,292 | 4,064 |
kW-mo/yr
|
$5.49 |
| Electricity Fees | $11,459 | - |
|
- |
| Natural Gas | $78,198 | 5,433 |
MMBtu
|
$14.39 |
| TOTAL YEARLY COSTS | $383,568 | |||
| RECOMMENDED SAVINGS* | $107,065 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $36,047 | $247,000 | - |
$36,047
-
MMBtu
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,416 | - |
$3,416
18,960
kWh
|
- | |
| 03 | 2.1224: Replace boiler | $6,936 | $20,000 | - |
$6,936
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $57,406 | $206,000 |
$57,406
318,920
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,260 | $3,400 |
$3,260
18,120
kWh
|
- | |
| TOTAL RECOMMENDED | $107,065 | $476,400 |
$64,082
356,000
kWh
|
$42,983
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs