ITAC Assessment: LS2113
ITAC logo
ITAC Assessment: LS2113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Wood Pellet
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range less than $500
k
# of Employees 71
Plant Area 2,701,000
ft2
Annual Production 520,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,754,061 80,166,240
kWh
Electricity Demand $1,601,367 141,593
kW-mo/yr
TOTAL YEARLY COSTS $4,355,428
RECOMMENDED SAVINGS* $57,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,608 $50 $2,608
76,710
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,312 $318 $2,312
68,010
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,491 $585 $2,491
73,254
kWh
-
04 2.7135: Install occupancy sensors $2,236 $646 $2,236
65,091
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $40,876 $16,200 $40,876
1,202,236
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,512 $6,847 $4,053
117,983
kWh
$2,459
-
kW-mo/yr
TOTAL RECOMMENDED $57,035 $24,646 $54,576
1,603,284
kWh
$2,459
-
kW-mo/yr
TOTAL IMPLEMENTED $9,003 $7,432 $6,544
191,237
kWh
$2,459
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs