| Assessment Year | 2021 |
|---|---|
| Principal Product | Wood Pellet |
| NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | less than $500 k |
| # of Employees | 71 |
| Plant Area |
2,701,000
ft2
|
| Annual Production | 520,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Mississippi |
| View Case Study | |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,754,061 | 80,166,240 |
kWh
|
$0.034 |
| Electricity Demand | $1,601,367 | 141,593 |
kW-mo/yr
|
$11.31 |
| TOTAL YEARLY COSTS | $4,355,428 | |||
| RECOMMENDED SAVINGS* | $57,035 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,003 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,608 | $50 |
$2,608
76,710
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,312 | $318 |
$2,312
68,010
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,491 | $585 |
$2,491
73,254
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $2,236 | $646 |
$2,236
65,091
kWh
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $40,876 | $16,200 |
$40,876
1,202,236
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,512 | $6,847 |
$4,053
117,983
kWh
|
$2,459
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $57,035 | $24,646 |
$54,576
1,603,284
kWh
|
$2,459
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $9,003 | $7,432 |
$6,544
191,237
kWh
|
$2,459
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs