ITAC Assessment: WV0199
ITAC logo
ITAC Assessment: WV0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Low fat salted pretzel nuggets
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 120,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,285 4,881,888
kWh
Electricity Demand $95,022 10,299
kW-mo/yr
Electricity Fees $17,803 -
Natural Gas $222,607 51,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,872

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2426: Use waste heat from flue gases to heat space conditioning air $70,513 $4,890 $70,513
1,865,182
kWh
- - -
02 2.2628: Utilize a less expensive cooling method $4,354 $2,088 $4,354
115,182
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $418 $570 $418
11,137
kWh
- - -
04 2.7144: Install spectral reflectors / delamp $2,761 $2,201 $2,761
50,117
kWh
- - -
05 2.4157: Establish a predictive maintenance program $1,757 $772 $1,757
32,239
kWh
- - -
06 2.2437: Recover waste heat from equipment $7,325 $900 - $7,325
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $1,828 $505 $1,828
48,359
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,862 $25 $1,862
49,238
kWh
- - -
09 2.7135: Install occupancy sensors $3,047 $700 $3,047
80,598
kWh
- - -
10 3.5217: Reuse / recycle/ sell paper products $720 $450 - - $720
-
lb
-
11 3.5212: Regrind, reuse, or sell scrap plastic parts $7,186 $7,000 - - $7,186
-
lb
-
12 4.441: Install automatic packing equipment $124,800 $360,000 - - - $124,800
TOTAL RECOMMENDED $226,571 $380,101 $86,540
2,252,052
kWh
$7,325
-
MMBtu
$7,906
-
lb
$124,800
TOTAL IMPLEMENTED $11,872 $6,106 $11,152
257,913
kWh
- $720
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs