ITAC Assessment: OK1175
ITAC logo
ITAC Assessment: OK1175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Sheet metal HVAC equipment
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 89
Plant Area 203,000
ft2
Annual Production 1,800,000
lb
Production Hrs. Annual 5,460
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,782 1,013,600
kWh
Electricity Demand $36,503 2,760
kW-mo/yr
Natural Gas $12,125 1,557
MMBtu
Waste Disposal Costs
Water Usage $946 198
Tgal
Water Disposal $411 198
Tgal
TOTAL YEARLY COSTS $113,767
RECOMMENDED SAVINGS* $15,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.9114: Use solar heat to make electricty $9,655 $117,936 $9,655
153,260
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,605 $277 $1,605
25,474
kWh
03 2.7226: Use computer programs to optimize hvac performance $3,749 $19,250 $3,749
59,514
kWh
04 2.7211: Clean and maintain refrigerant condensers and towers $530 $964 $530
8,409
kWh
05 2.6211: Conserve energy by efficient use of vending machines $168 $248 $168
2,660
kWh
TOTAL RECOMMENDED $15,707 $138,675 $15,707
249,317
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs