ITAC Assessment: OK0129
ITAC logo
ITAC Assessment: OK0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product OIL RESEARCH VEHICLES
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 50
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,738 446,659
kWh
Natural Gas $24,932 3,495
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,609 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,246

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.5123: Reduce fluid flow rates $4,300 $3,000 - $4,300
-
MMBtu
02 2.7261: Install timers and/or thermostats $1,080 $900 - $1,080
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $294 $200 - $294
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $676 $306 $676
13,775
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $34 $27 $34
1,172
kWh
-
06 2.6232: Install set-back timers $162 $110 $162
5,569
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $63 $10 $63
1,172
kWh
-
TOTAL RECOMMENDED $6,609 $4,553 $935
21,688
kWh
$5,674
-
MMBtu
TOTAL IMPLEMENTED $2,246 $1,543 $872
20,516
kWh
$1,374
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs