ITAC Assessment: OK0225
ITAC logo
ITAC Assessment: OK0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PHOTOPROCESSING SYSTEMS
NAICS
n/a
SIC 3861: Photographic Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,796 2,199,004
kWh
Natural Gas $38,570 11,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,333

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $886 $220 $886
5,275
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $332 $1,101 $332
1,758
kWh
- -
03 2.4133: Use most efficient type of electric motors $71 $125 $71
879
kWh
- -
04 2.7231: Use radiant heater for spot heating $4,851 $16,900 - $4,851
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,012 - $2,132
31,360
kWh
- $(-120.0)
06 2.2136: Install / repair insulation on steam lines $1,078 $5,558 - $1,078
-
MMBtu
-
07 2.2511: Insulate bare equipment $181 $500 - $181
-
MMBtu
-
TOTAL RECOMMENDED $9,411 $24,404 $3,421
39,272
kWh
$6,110
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $8,333 $18,846 $3,421
39,272
kWh
$5,032
-
MMBtu
$(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings