ITAC Assessment: NC0617
ITAC logo
ITAC Assessment: NC0617
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Adhesives
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 26
Plant Area 100,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 3,125
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,946 926,520
kWh
Electricity Demand $10,051 1,491
kW-mo/yr
Electricity Fees $8,711 -
Natural Gas $38,308 6,658
MMBtu
TOTAL YEARLY COSTS $121,016
RECOMMENDED SAVINGS* $11,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,639

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,647 $16,472 $2,874
41,655
kWh
$1,773
-
kW-mo/yr
-
02 2.7134: Use photocell controls $1,341 $450 $1,058
15,330
kWh
$283
-
kW-mo/yr
-
03 2.2136: Install / repair insulation on steam lines $352 $90 - - $352
-
MMBtu
04 2.4226: Use / purchase optimum sized compressor $4,137 $12,000 $3,009
43,602
kWh
$1,128
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $300 $1,250 - - $300
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,162 $50,000 - - $1,162
-
MMBtu
TOTAL RECOMMENDED $11,939 $80,262 $6,941
100,587
kWh
$3,184
-
kW-mo/yr
$1,814
-
MMBtu
TOTAL IMPLEMENTED $11,639 $79,012 $6,941
100,587
kWh
$3,184
-
kW-mo/yr
$1,514
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs