| Assessment Year | 2026 |
|---|---|
| Principal Product | Steel Framing |
| NAICS | 332322: Sheet Metal Work Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $100 M to 500M |
| # of Employees | 128 |
| Plant Area |
571,000
ft2
|
| Annual Production | 135,282,374
lb
|
| Production Hrs. Annual | 6,856
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $142,191 | 3,076,401 |
kWh
|
$0.046 | |
| Electricity Demand | $130,887 | 9,911 |
kW-mo/yr
|
$13.21 | |
| Electricity Fees | $6,411 | - |
|
- | |
| Natural Gas | $11,724 | 869 |
MMBtu
|
$13.49 | |
| Waste Disposal Costs | |||||
| Water Usage | $27,483 | 1,950 |
Tgal
|
$14.09 | |
| TOTAL YEARLY COSTS | $318,696 | ||||
| RECOMMENDED SAVINGS* | $402,544 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $150,000 | $35,400 | - | - | - | - | $150,000 | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $142,635 | $71,624 |
$12,702
274,925
kWh
|
$8,915
-
kW-mo/yr
|
- | - | $121,019 | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,162 | $5,609 |
$6,549
141,743
kWh
|
$3,613
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,221 | - |
$3,911
84,655
kWh
|
$2,310
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $64,273 | $36,400 |
$525
11,326
kWh
|
- | - | - | $63,749 | |
| 06 | 2.3212: Optimize plant power factor | $26,908 | $18,471 | - | - | $26,908 | - | - | |
| 07 | 2.6231: Utilize controls to operate equipment only when needed | $2,345 | $4,000 | - | - | - |
$2,345
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $402,544 | $171,504 |
$23,686
512,649
kWh
|
$14,838
-
kW-mo/yr
|
$26,908 |
$2,345
-
MMBtu
|
$334,768 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs