Assessment Year 1995
Principal Product Fabricated Structural Steel
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 216,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 4,589
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,062 1,933,763
kWh
Natural Gas $31,262 7,210
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,270 $1,370 $3,270
27,550
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $2,684 $4,060 $2,684
24,326
kWh
- -
03 2.3136: Overlap custodial services with normal day hours $2,262 - $2,262
62,720
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $739 $150 $739
9,965
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,404 $500 $5,404
73,564
kWh
- -
06 2.4133: Use most efficient type of electric motors $1,363 $2,380 $1,363
16,999
kWh
- -
07 2.7231: Use radiant heater for spot heating $10,669 $10,000 - $10,669
-
MMBtu
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $13,200 $7,000 - - $13,200
-
lb
TOTAL RECOMMENDED $39,591 $25,460 $15,722
215,124
kWh
$10,669
-
MMBtu
$13,200
-
lb
TOTAL IMPLEMENTED $37,329 $25,460 $13,460
152,404
kWh
$10,669
-
MMBtu
$13,200
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs