ITAC Assessment: UC2605
ITAC logo
ITAC Assessment: UC2605
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Cold-formed steel framing
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $100
M
to 500
M
# of Employees 98
Plant Area 259,443
ft2
Annual Production 110,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,483 1,783,593
kWh
Electricity Demand $147,596 5,515
kW-mo/yr
Electricity Fees $67,954 -
Natural Gas $146,477 14,531
MMBtu
LPG $39,078 2,143
MMBtu
TOTAL YEARLY COSTS $704,588
RECOMMENDED SAVINGS* $75,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $25,923 $14,733 - - $25,923
02 2.8121: Apply for tax-free status for energy purchases $21,532 - - - $21,532
03 2.8123: Pay utility bills on time $754 - - - $754
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,857 $1,560 $2,968
17,441
kWh
$889
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,118 - $3,058
17,967
kWh
$1,060
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $7,251 $9,750 $6,882
40,435
kWh
$369
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $10,941 $68,400 $8,401
49,358
kWh
$2,540
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $607 $1,560 $551
3,235
kWh
$56
-
kW-mo/yr
-
09 2.7134: Use photocell controls $706 $1,800 $642
3,774
kWh
$64
-
kW-mo/yr
-
TOTAL RECOMMENDED $75,689 $97,803 $22,502
132,210
kWh
$4,978
-
kW-mo/yr
$48,209
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs