ITAC Assessment: OK1168
ITAC logo
ITAC Assessment: OK1168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product architectural & security fencing
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $100
M
to 500
M
# of Employees 499
Plant Area 696,530
ft2
Annual Production 70,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,269,324 21,347,287
kWh
Electricity Demand $833,008 61,888
kW-mo/yr
Natural Gas $794,892 203,784
MMBtu
Waste Disposal Costs
Water Usage $56,101 14,855
Tgal
Water Disposal $175,046 14,855
Tgal
TOTAL YEARLY COSTS $3,128,371
RECOMMENDED SAVINGS* $450,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $191,746 $2,249,280 $191,746
3,249,926
kWh
- - -
02 2.1116: Improve combustion control capability $21,754 $22,000 - - $21,754
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $21,653 $7,320 - - $21,653
-
MMBtu
-
04 2.7226: Use computer programs to optimize hvac performance $23,054 $132,000 $23,054
390,737
kWh
- - -
05 2.7211: Clean and maintain refrigerant condensers and towers $31,328 $4,725 $31,328
530,983
kWh
- - -
06 2.3212: Optimize plant power factor $26,193 $97,774 - - - $26,193
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,838 $23,792 $46,838
793,871
kWh
- - -
08 2.2437: Recover waste heat from equipment $13,393 $400 - - $13,393
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $41,364 $3,030 $40,314
683,280
kWh
$1,050
-
kW-mo/yr
- -
10 2.8123: Pay utility bills on time $33,366 - - - - $33,366
TOTAL RECOMMENDED $450,689 $2,540,321 $333,280
5,648,797
kWh
$1,050
-
kW-mo/yr
$56,800
-
MMBtu
$59,559
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs