Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Paper-backed foam sheets and rolls
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 149
Plant Area 100,000
ft2
Annual Production 25,900
thousand feet
Production Hrs. Annual 8,568
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,840 2,063,711
kWh
Electricity Demand $45,258 4,092
kW-mo/yr
Electricity Fees $7,898 -
Natural Gas $55,837 6,144
MMBtu
TOTAL YEARLY COSTS $203,833
RECOMMENDED SAVINGS* $75,273 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1132: Repair faulty louvers and dampers $20,616 $975 - - $20,616
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $4,912 $5,000 $3,323
72,241
kWh
$1,589
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $634 $495 $73
1,575
kWh
$35
-
kW-mo/yr
$527
-
MMBtu
04 2.2437: Recover waste heat from equipment $5,199 $6,100 - - $5,199
-
MMBtu
05 2.2443: Re-use or recycle hot or cold process exhaust air $3,655 $5,200 - - $3,655
-
MMBtu
06 2.2515: Use optimum thickness insulation $692 $2,233 - - $692
-
MMBtu
07 2.2622: Replace existing chiller with high efficiency model $11,396 $21,500 $7,709
167,584
kWh
$3,687
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,587 $13,450 $5,133
111,580
kWh
$2,454
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $278 $210 $189
4,094
kWh
$89
-
kW-mo/yr
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $20,304 $22,424 $13,735
298,585
kWh
$6,569
-
kW-mo/yr
-
TOTAL RECOMMENDED $75,273 $77,587 $30,162
655,659
kWh
$14,423
-
kW-mo/yr
$30,689
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs