Assessment Year | 2002 |
---|---|
Principal Product | Plastics |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 131 |
Plant Area |
n/a
|
Annual Production | 169
ton
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $170,029 | 2,905,101 |
kWh
|
$0.059 |
Electricity Demand | $13,403 | 13,008 |
kW-mo/yr
|
$1.03 |
Electricity Fees | $1,434 | - |
|
- |
Natural Gas | $33,317 | 4,915 |
MMBtu
|
$6.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,409 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1133: Adjust burners for efficient operation | $24,100 | - |
$24,100
411,264
kWh
|
- | - | - | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $19,686 | $63,600 |
$23,697
404,380
kWh
|
$1,063
-
kW-mo/yr
|
- |
$(-5,074.0)
-
MMBtu
|
- | - | - | |
03 | 2.2696: Use excess cold process fluid for industrial cooling needs | $1,324 | $2,600 |
$(-717.0)
(-12,238)
kWh
|
- | - | - |
$505
-
Tgal
|
- |
$1,536
-
Tgal
|
|
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,036 | $1,800 |
$1,519
25,920
kWh
|
$89
-
kW-mo/yr
|
- | - | - | $428 | - | |
05 | 2.3212: Optimize plant power factor | $1,263 | $4,125 | - | - | $1,263 | - | - | - | - | |
TOTAL RECOMMENDED | $48,409 | $72,125 |
$48,599
829,326
kWh
|
$1,152
-
kW-mo/yr
|
$1,263 |
$(-5,074.0)
-
MMBtu
|
$505
-
Tgal
|
$428 |
$1,536
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs