ITAC Assessment: IP0224
ITAC logo
ITAC Assessment: IP0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Metal fabrication
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 41
Plant Area 72,000
ft2
Annual Production 15,111,099
pieces
Production Hrs. Annual 4,208
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,609 1,095,000
kWh
Natural Gas $12,794 1,233
MMBtu
Waste Disposal Costs
Water Usage $1,435 205
Tgal
Water Disposal $2,310 205
Tgal
TOTAL YEARLY COSTS $114,148
RECOMMENDED SAVINGS* $9,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $3,464 $731 $3,464
38,924
kWh
-
02 2.2437: Recover waste heat from equipment $4,828 $3,830 $(-279.0)
(-3,138)
kWh
$5,107
-
MMBtu
03 2.4224: Upgrade controls on compressors $953 $1,752 $953
10,710
kWh
-
04 2.7135: Install occupancy sensors $449 $929 $449
5,049
kWh
-
TOTAL RECOMMENDED $9,694 $7,242 $4,587
51,545
kWh
$5,107
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs