ITAC Assessment: SD0664
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel Tubing
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 157
Plant Area 76,319
ft2
Annual Production 1,000
units
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $359,826 1,848,653
kWh
Electricity Demand $184,993 3,700
kW-mo/yr
Electricity Fees $5,150 -
Natural Gas $55,113 4,695
MMBtu
Waste Disposal Costs
Other Liquid (haz) $243,039 426,384
gal
TOTAL YEARLY COSTS $848,121
RECOMMENDED SAVINGS* $798,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.9114: Use solar heat to make electricty $564,124 $638,912 $270,148
1,388,220
kWh
$293,976
-
kW-mo/yr
- -
02 2.3141: Use battery storage for demand control $82,562 $4,772 $(-9,948.8)
(-51,125)
kWh
$92,511
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $3,786 $6,845 - - $3,786
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,835 $3,044 $4,291
22,052
kWh
$1,544
-
kW-mo/yr
- -
05 4.212: Adopt in-house material generation $107,677 $47,756 $(-69,965.0)
(-359,535)
kWh
$(-33,570.0)
-
kW-mo/yr
- $211,212
-
gal
06 2.1221: Replace obsolete burners with more efficient ones $15,250 $16,600 - - $15,250
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,187 $1,186 $873
4,485
kWh
$314
-
kW-mo/yr
- -
08 2.4223: Install direct acting units in place of compressed air pressure system in safety system $16,147 $6,200 $16,147
82,974
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $2,377 $250 $2,377
12,217
kWh
- - -
TOTAL RECOMMENDED $798,946 $725,565 $213,922
1,099,288
kWh
$354,775
-
kW-mo/yr
$19,037
-
MMBtu
$211,212
-
gal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs