ITAC Assessment: AS0298
ITAC logo
ITAC Assessment: AS0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Plastic bottle caps
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 83,000
ft2
Annual Production 1,320,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,171 6,134,850
kWh
Electricity Demand $103,456 11,486
kW-mo/yr
Electricity Fees $36,535 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,767 $11,030 $2,119
49,722
kWh
$648
-
kW-mo/yr
-
02 2.7145: Install skylights $2,099 $11,395 $2,099
44,154
kWh
- -
03 2.7135: Install occupancy sensors $154 $375 $88
1,856
kWh
$66
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,334 $90 $2,320
54,435
kWh
$1,014
-
kW-mo/yr
-
05 3.6192: Use a less expensive method of waste removal $960 $60 - - $960
TOTAL RECOMMENDED $9,314 $22,950 $6,626
150,167
kWh
$1,728
-
kW-mo/yr
$960
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs