ITAC Assessment: UW0024
ITAC logo
ITAC Assessment: UW0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Aerospace Composites
NAICS 336411: Aircraft Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 140,000
ft2
Annual Production 13,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,950 1,875,030
kWh
Electricity Demand $44,447 13,268
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,517 $48,000 $8,646
183,575
kWh
$1,262
-
kW-mo/yr
$1,609 - -
02 2.3137: Use power during off-peak periods $4,202 $400 $(-9,702.0)
-
kWh
$13,904
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,586 - $2,857
79,365
kWh
$509
-
kW-mo/yr
- - $(-780.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $889 - $754
20,947
kWh
$135
-
kW-mo/yr
- - -
05 3.4151: Minimize water usage $3,573 - - - - $3,573
-
Tgal
-
TOTAL RECOMMENDED $22,767 $48,400 $2,555
283,887
kWh
$15,810
-
kW-mo/yr
$1,609 $3,573
-
Tgal
$(-780.0)
TOTAL IMPLEMENTED $18,565 $48,000 $12,257
283,887
kWh
$1,906
-
kW-mo/yr
$1,609 $3,573
-
Tgal
$(-780.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs