ITAC Assessment: UD1133
ITAC logo
ITAC Assessment: UD1133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Pressure vessels
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $100
M
to 500
M
# of Employees 307
Plant Area 188,000
ft2
Annual Production 3,409,518
units
Production Hrs. Annual 6,864
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,233,861 15,916,656
kWh
Electricity Demand $284,710 37,006
kW-mo/yr
Electricity Fees $42,175 -
Natural Gas $704,965 216,565
MMBtu
Waste Disposal Costs
Water Usage $121,892 28,889
Tgal
Water Disposal $257,546 26,091
Tgal
TOTAL YEARLY COSTS $2,645,149
RECOMMENDED SAVINGS* $132,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7442: Keep doors and windows shut when not on use $4,219 - - - $4,219
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $4,175 $1,260 - - $4,175
-
MMBtu
03 2.4311: Recover mechanical energy $45,407 $13,165 $38,692
499,253
kWh
$6,715
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $23,389 $4,800 $19,908
256,863
kWh
$3,481
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,110 $953 $15,433
199,132
kWh
$2,677
-
kW-mo/yr
-
06 2.4113: Install motor voltage controller on lightly loaded motors $15,205 $8,166 $12,956
167,169
kWh
$2,249
-
kW-mo/yr
-
07 2.6212: Turn off equipment during breaks, reduce operating time $15,140 - $15,140
132,000
kWh
- -
08 2.2444: Use hot process fluids to preheat incoming process fluids $7,222 $2,552 $(-397.0)
(-5,118)
kWh
$(-69.0)
-
kW-mo/yr
$7,688
-
MMBtu
09 2.7135: Install occupancy sensors $108 $218 $89
1,153
kWh
$19
-
kW-mo/yr
-
TOTAL RECOMMENDED $132,975 $31,114 $101,821
1,250,452
kWh
$15,072
-
kW-mo/yr
$16,082
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs