| Assessment Year | 2026 |
|---|---|
| Principal Product | Pressure vessels |
| NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $100 M to 500M |
| # of Employees | 307 |
| Plant Area |
188,000
ft2
|
| Annual Production | 3,409,518
units
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,233,861 | 15,916,656 |
kWh
|
$0.078 | |
| Electricity Demand | $284,710 | 37,006 |
kW-mo/yr
|
$7.69 | |
| Electricity Fees | $42,175 | - |
|
- | |
| Natural Gas | $704,965 | 216,565 |
MMBtu
|
$3.26 | |
| Waste Disposal Costs | |||||
| Water Usage | $121,892 | 28,889 |
Tgal
|
$4.22 | |
| Water Disposal | $257,546 | 26,091 |
Tgal
|
$9.87 | |
| TOTAL YEARLY COSTS | $2,645,149 | ||||
| RECOMMENDED SAVINGS* | $132,975 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7442: Keep doors and windows shut when not on use | $4,219 | - | - | - |
$4,219
-
MMBtu
|
|
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,175 | $1,260 | - | - |
$4,175
-
MMBtu
|
|
| 03 | 2.4311: Recover mechanical energy | $45,407 | $13,165 |
$38,692
499,253
kWh
|
$6,715
-
kW-mo/yr
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $23,389 | $4,800 |
$19,908
256,863
kWh
|
$3,481
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,110 | $953 |
$15,433
199,132
kWh
|
$2,677
-
kW-mo/yr
|
- | |
| 06 | 2.4113: Install motor voltage controller on lightly loaded motors | $15,205 | $8,166 |
$12,956
167,169
kWh
|
$2,249
-
kW-mo/yr
|
- | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $15,140 | - |
$15,140
132,000
kWh
|
- | - | |
| 08 | 2.2444: Use hot process fluids to preheat incoming process fluids | $7,222 | $2,552 |
$(-397.0)
(-5,118)
kWh
|
$(-69.0)
-
kW-mo/yr
|
$7,688
-
MMBtu
|
|
| 09 | 2.7135: Install occupancy sensors | $108 | $218 |
$89
1,153
kWh
|
$19
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $132,975 | $31,114 |
$101,821
1,250,452
kWh
|
$15,072
-
kW-mo/yr
|
$16,082
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs