ITAC Assessment: WV0410
ITAC logo
ITAC Assessment: WV0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Printed Circuit Board
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 65,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,590
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,922 2,656,830
kWh
Electricity Demand $13,274 5,451
kW-mo/yr
Natural Gas $15,912 1,469
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $92,924 - - - $92,924 - -
02 2.7229: Air condition only space necessary $6,499 $900 $4,232
40,727
kWh
$144
-
kW-mo/yr
- $2,123
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $3,551 $2,200 $1,721
16,572
kWh
- - $1,830
-
MMBtu
-
04 2.4312: Improve lubrication practices $1,907 $618 $1,850
17,806
kWh
$57
-
kW-mo/yr
- - -
05 2.7231: Use radiant heater for spot heating $1,430 $5,800 - - - $1,430
-
MMBtu
-
06 2.7135: Install occupancy sensors $1,273 $210 $1,200
11,545
kWh
$73
-
kW-mo/yr
- - -
07 2.7313: Recycle air for heating, ventilation and air conditioning $1,222 $3,100 - - - $1,722
-
MMBtu
$(-500.0)
08 2.7111: Reduce illumination to minimum necessary levels $1,020 $67 $961
9,253
kWh
$59
-
kW-mo/yr
- - -
09 2.2437: Recover waste heat from equipment $563 $274 - - - $563
-
MMBtu
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $200 $20 $188
1,727
kWh
$12
-
kW-mo/yr
- - -
11 2.4221: Install compressor air intakes in coolest locations $145 $440 $138
1,333
kWh
$7
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $110,734 $13,629 $10,290
98,963
kWh
$352
-
kW-mo/yr
$92,924 $7,668
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $100,875 $3,115 $5,920
56,903
kWh
$201
-
kW-mo/yr
$92,924 $1,830
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs