Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
872 matching assessments
ARC 2+ Digits Required
NAICS Machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
SF0381 2009 Lawn edging from recycled plastics 9 $409k $58k
NC0398 2009 Power tools 7 $3,501k $215k
SU0288 2009 Precision lenses 5 $369k $57k
SU0287 2009 Sheet metal fabrication and assembly 9 $308k $72k
NC0396 2009 Conveyor rollers 7 $214k $151k
SD0420 2009 Server cabinets and cable management racks 5 $407k $12k
MZ0038 2009 Precision drilling machine 5 $100k $5.6k
MA0652 2009 Optical components and assemblies 4 $771k $33k
LL0314 2009 Heavy duty cam shafts 9 $2,111k $292k
MI0178 2009 Turbine blades 7 $1,329k $203k
GT0864 2009 Ac air handlers 7 $1,157k $173k
NC0389 2009 Printing sleeves 5 $427k $22k
UM0351 2008 Capital equipment for heat exchanger industry 6 $853k $59k
UD0793 2008 Water softeners 12 $204k $39k
SU0279 2008 Extrusion dies/tooling 10 $473k $34k
MA0644 2008 Desiccant dehumidification air handlers 6 $527k $75k
SU0274 2008 Point of sale hardware 11 $404k $32k
GT0858 2008 Ice machines 8 $832k $49k
AM0554 2008 Steel forgings 9 $4,854k $497k
LL0305 2008 Hydraulic tubular handling equipment 7 $124k $39k