Assessment Year | 2009 |
---|---|
Principal Product | AC Air Handlers |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 550 |
Plant Area |
656,000
ft2
|
Annual Production | 357,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $615,018 | 12,300,363 |
kWh
|
$0.050 |
Electricity Demand | $137,316 | 8,292 |
kW-mo/yr
|
$16.56 |
Electricity Fees | $207,374 | - |
|
- |
Natural Gas | $197,184 | 18,414 |
MMBtu
|
$10.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $172,963 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $6,717 | - | - |
$6,717
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,440 | $3,700 |
$18,440
256,170
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $17,020 | $31,520 |
$17,020
236,440
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,083 | $90,000 |
$17,875
357,500
kWh
|
$14,208
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,718 | $61,839 |
$13,774
275,480
kWh
|
$10,944
-
kW-mo/yr
|
|
06 | 2.7245: Use direct air supply to exhaust hoods | $17,955 | $22,473 |
$3,150
62,990
kWh
|
$14,805
-
kW-mo/yr
|
|
07 | 2.7241: Install outside air damper / economizer on hvac unit | $56,030 | $107,040 |
$56,030
778,156
kWh
|
- | |
TOTAL RECOMMENDED | $172,963 | $316,572 |
$126,289
1,966,736
kWh
|
$46,674
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs