Assessment Year | 2010 |
---|---|
Principal Product | Heat Exchangers |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $5 M to 10M |
# of Employees | 49 |
Plant Area |
85,000
ft2
|
Annual Production | 18,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $128,095 | 2,129,632 |
kWh
|
$0.060 |
Electricity Demand | $14,756 | 11,625 |
kW-mo/yr
|
$1.27 |
Electricity Fees | $63,137 | - |
|
- |
Natural Gas | $23,817 | 2,880 |
MMBtu
|
$8.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,907 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,588 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,903 | $31,050 |
$11,286
184,008
kWh
|
$1,426
-
kW-mo/yr
|
$191 | |
02 | 2.4226: Use / purchase optimum sized compressor | $11,920 | $140 |
$10,089
164,493
kWh
|
$1,655
-
kW-mo/yr
|
$176 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,685 | $389 |
$3,630
59,192
kWh
|
- | $55 | |
04 | 2.7135: Install occupancy sensors | $3,399 | $671 |
$3,348
54,588
kWh
|
- | $51 | |
TOTAL RECOMMENDED | $31,907 | $32,250 |
$28,353
462,281
kWh
|
$3,081
-
kW-mo/yr
|
$473 | ||
TOTAL IMPLEMENTED | $16,588 | $31,439 |
$14,916
243,200
kWh
|
$1,426
-
kW-mo/yr
|
$246 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs