ITAC Assessment: MS0349
ITAC logo
ITAC Assessment: MS0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Heat Exchangers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 85,000
ft2
Annual Production 18,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,095 2,129,632
kWh
Electricity Demand $14,756 11,625
kW-mo/yr
Electricity Fees $63,137 -
Natural Gas $23,817 2,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,588

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,903 $31,050 $11,286
184,008
kWh
$1,426
-
kW-mo/yr
$191
02 2.4226: Use / purchase optimum sized compressor $11,920 $140 $10,089
164,493
kWh
$1,655
-
kW-mo/yr
$176
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,685 $389 $3,630
59,192
kWh
- $55
04 2.7135: Install occupancy sensors $3,399 $671 $3,348
54,588
kWh
- $51
TOTAL RECOMMENDED $31,907 $32,250 $28,353
462,281
kWh
$3,081
-
kW-mo/yr
$473
TOTAL IMPLEMENTED $16,588 $31,439 $14,916
243,200
kWh
$1,426
-
kW-mo/yr
$246
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs