Assessment Year 2025
Principal Product Printed Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 90,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $235,108 1,301,578
kWh
Electricity Demand $73,634 3,645
kW-mo/yr
Electricity Fees $(-181,575.0) -
Natural Gas $26,197 1,393
MMBtu
TOTAL YEARLY COSTS $153,364
RECOMMENDED SAVINGS* $283,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,052 - $18,252
101,068
kWh
- - $(-1,200.0) -
02 2.6218: Turn off equipment when not in use $8,005 - $8,005
44,325
kWh
- - - -
03 2.6218: Turn off equipment when not in use $22,379 $883 $5,901
32,676
kWh
- $16,478
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,310 $2,631 $947
5,242
kWh
$287
-
kW-mo/yr
- $74 $2
05 2.9114: Use solar heat to make electricty $235,065 $1,065,176 $235,065
1,301,578
kWh
- - - -
TOTAL RECOMMENDED $283,811 $1,068,690 $268,170
1,484,889
kWh
$287
-
kW-mo/yr
$16,478
-
MMBtu
$(-1,126.0) $2
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs