ITAC Assessment: SD0555
ITAC logo
ITAC Assessment: SD0555
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Residential, commercial and industrial grade brushes
NAICS 339994: Broom, Brush, and Mop Manufacturing
SIC 3991: Brooms and Brushes
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 183,000
ft2
Annual Production 7,000,000
units
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,102 705,975
kWh
Electricity Demand $61,084 2,881
kW-mo/yr
Electricity Fees $4,306 -
TOTAL YEARLY COSTS $118,492
RECOMMENDED SAVINGS* $22,656 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3132: Recharge batteries on during off-peak demand periods $18,916 $65,600 $(-1,007.0)
(-14,600)
kWh
$19,923
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,771 $1,100 $1,771
23,552
kWh
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,035 $6,550 $749
9,964
kWh
$286
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $489 $600 $489
6,502
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $445 $850 $445
5,922
kWh
-
TOTAL RECOMMENDED $22,656 $74,700 $2,447
31,340
kWh
$20,209
-
kW-mo/yr
TOTAL IMPLEMENTED $2,260 $1,700 $2,260
30,054
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs