ITAC Assessment: MA0652
ITAC logo
ITAC Assessment: MA0652
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Optical components and assemblies
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 146
Plant Area 100,000
ft2
Annual Production 728,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $506,130 3,794,682
kWh
Electricity Demand $51,671 7,406
kW-mo/yr
Electricity Fees $20,682 -
Natural Gas $7,812 303
MMBtu
LPG $184,573 7,544
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,132

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.7311: Ventilation system to shut off when room is not in use $11,122 $1,990 $495
3,614
kWh
- - $10,627
-
MMBtu
02 2.2614: Use cooling tower or economizer to replace chiller cooling $10,132 $23,474 $10,132
73,953
kWh
- - -
03 2.6218: Turn off equipment when not in use $7,667 - $5,927
43,264
kWh
$1,740
-
kW-mo/yr
- -
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $3,585 $6,600 $1,900
13,866
kWh
- $1,685
-
MMBtu
-
TOTAL RECOMMENDED $32,506 $32,064 $18,454
134,697
kWh
$1,740
-
kW-mo/yr
$1,685
-
MMBtu
$10,627
-
MMBtu
TOTAL IMPLEMENTED $10,132 $23,474 $10,132
73,953
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs