| Assessment Year | 2009 |
|---|---|
| Principal Product | Turbine Blades |
| NAICS | 333611: Turbine and Turbine Generator Set Units Manufacturing |
| SIC | 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
200,000
ft2
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $870,561 | 13,946,397 |
kWh
|
$0.062 |
| Electricity Demand | $297,291 | 34,024 |
kW-mo/yr
|
$8.74 |
| Electricity Fees | $161,419 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $203,215 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $78,463 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $88,417 | $70,875 |
$83,505
947,835
kWh
|
$4,912
-
kW-mo/yr
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $53,553 | $7,140 |
$50,578
574,097
kWh
|
$2,975
-
kW-mo/yr
|
|
| 03 | 2.7496: Install partitions to reduce size of conditioned space | $18,854 | $40,320 |
$17,961
172,229
kWh
|
$893
-
kW-mo/yr
|
|
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $17,481 | $11,118 |
$16,510
187,404
kWh
|
$971
-
kW-mo/yr
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,720 | $1,210 |
$17,718
207,474
kWh
|
$1,002
-
kW-mo/yr
|
|
| 06 | 2.4323: Use optimum size and capacity equipment | $2,908 | $4,531 |
$2,719
31,833
kWh
|
$189
-
kW-mo/yr
|
|
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,282 | $40 |
$3,016
35,316
kWh
|
$266
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $203,215 | $135,234 |
$192,007
2,156,188
kWh
|
$11,208
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $78,463 | $12,921 |
$74,031
848,720
kWh
|
$4,432
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs