ITAC Assessment: MI0178
ITAC logo
ITAC Assessment: MI0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Turbine Blades
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 200,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $870,561 13,946,397
kWh
Electricity Demand $297,291 34,024
kW-mo/yr
Electricity Fees $161,419 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $203,215 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,463

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $88,417 $70,875 $83,505
947,835
kWh
$4,912
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $53,553 $7,140 $50,578
574,097
kWh
$2,975
-
kW-mo/yr
03 2.7496: Install partitions to reduce size of conditioned space $18,854 $40,320 $17,961
172,229
kWh
$893
-
kW-mo/yr
04 2.7447: Install vinyl strip / high speed / air curtain doors $17,481 $11,118 $16,510
187,404
kWh
$971
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,720 $1,210 $17,718
207,474
kWh
$1,002
-
kW-mo/yr
06 2.4323: Use optimum size and capacity equipment $2,908 $4,531 $2,719
31,833
kWh
$189
-
kW-mo/yr
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,282 $40 $3,016
35,316
kWh
$266
-
kW-mo/yr
TOTAL RECOMMENDED $203,215 $135,234 $192,007
2,156,188
kWh
$11,208
-
kW-mo/yr
TOTAL IMPLEMENTED $78,463 $12,921 $74,031
848,720
kWh
$4,432
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs