ITAC Assessment: SU0288
ITAC logo
ITAC Assessment: SU0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Precision Lenses
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,637 10,210,000
kWh
Electricity Demand $82,922 16,732
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,944

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,422 - $1,947
69,517
kWh
$475
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,730 $710 $2,195
78,402
kWh
$535
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $1,392 $2,257 $1,116
39,858
kWh
$276
-
kW-mo/yr
-
04 3.1191: Change procedures / equipment / operating conditions $50,239 $171,000 - - $50,239
05 2.6211: Conserve energy by efficient use of vending machines $161 $729 $161
5,739
kWh
- -
TOTAL RECOMMENDED $56,944 $174,696 $5,419
193,516
kWh
$1,286
-
kW-mo/yr
$50,239
TOTAL IMPLEMENTED $56,944 $174,696 $5,419
193,516
kWh
$1,286
-
kW-mo/yr
$50,239
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs