ITAC Assessment: IC0311
ITAC logo
ITAC Assessment: IC0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product State Garage to Maintain State Vehicles
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 20
Plant Area 16,390
ft2
Annual Production 1
units
Production Hrs. Annual 2,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,222 123,840
kWh
Electricity Fees $2,606 -
Natural Gas $11,086 1,122
MMBtu
TOTAL YEARLY COSTS $23,914
RECOMMENDED SAVINGS* $1,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7221: Lower temperature during the winter season and vice-versa $32 - $32
397
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $68 $244 $68
849
kWh
03 2.7135: Install occupancy sensors $39 $215 $39
489
kWh
04 2.7111: Reduce illumination to minimum necessary levels $112 $774 $112
1,398
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $389 $984 $389
4,867
kWh
06 2.4239: Eliminate or reduce compressed air usage $844 $140 $844
10,551
kWh
TOTAL RECOMMENDED $1,484 $2,357 $1,484
18,551
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs