| Assessment Year | 1987 |
|---|---|
| Principal Product | METAL FABRICATION |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 25,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $191,952 | 3,080,012 |
kWh
|
$0.062 |
| Natural Gas | $151,986 | 31,536 |
MMBtu
|
$4.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,883 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,313 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,584 | - |
$4,584
-
kWh
|
- | |
| 02 | 2.7492: Use proper thickness of insulation on building envelope | $2,048 | $7,200 | - |
$2,048
-
MMBtu
|
|
| 03 | 2.2437: Recover waste heat from equipment | $2,509 | $6,000 | - |
$2,509
-
MMBtu
|
|
| 04 | 2.7421: Reduce glazed areas in buildings | $3,429 | $5,800 | - |
$3,429
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,313 | $2,500 |
$2,979
64,771
kWh
|
$(-666.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $14,883 | $21,500 |
$7,563
64,771
kWh
|
$7,320
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,313 | $2,500 |
$2,979
64,771
kWh
|
$(-666.0)
-
MMBtu
|
||