ITAC Assessment: BD0038
ITAC logo
ITAC Assessment: BD0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Cold Run Steel Bars
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 49,000
ft2
Annual Production 32,000
ton
Production Hrs. Annual 5,200
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,057 2,229,191
kWh
Natural Gas $26,194 8,292
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,935

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $800 $950 $800
11,137
kWh
-
02 2.2437: Recover waste heat from equipment $1,940 $1,500 - $1,940
-
MMBtu
03 2.4133: Use most efficient type of electric motors $10,813 $32,290 $10,813
149,766
kWh
-
04 2.7135: Install occupancy sensors $1,772 $525 $1,772
24,619
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $3,472 $400 $3,472
48,066
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $195 $170 $195
2,638
kWh
-
TOTAL RECOMMENDED $18,992 $35,835 $17,052
236,226
kWh
$1,940
-
MMBtu
TOTAL IMPLEMENTED $2,935 $2,620 $995
13,775
kWh
$1,940
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs