ITAC Assessment: SU0281
ITAC logo
ITAC Assessment: SU0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Printing of commercial business products
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 150,000
ft2
Annual Production 265,300
units
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,451 1,339,819
kWh
Electricity Demand $35,942 3,618
kW-mo/yr
Electricity Fees $5,669 -
Natural Gas $56,177 5,170
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,952

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $8,503 - $8,503
98,868
kWh
- - - -
02 2.4322: Use or replace with energy efficient substitutes $1,848 - $1,073
12,480
kWh
$775
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,228 - $930
10,818
kWh
$298
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $248 - $188
2,190
kWh
$60
-
kW-mo/yr
- - -
05 2.4314: Use synthetic lubricant $48 - $38
438
kWh
$10
-
kW-mo/yr
- - -
06 2.2135: Repair and eliminate steam leaks $3,172 $53 - - $3,172
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $400 $90 $301
3,504
kWh
$99
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $712 $720 $331
3,854
kWh
$50
-
kW-mo/yr
- $100 $231
09 2.4221: Install compressor air intakes in coolest locations $408 $589 $309
3,591
kWh
$99
-
kW-mo/yr
- - -
10 2.6211: Conserve energy by efficient use of vending machines $676 $997 $676
7,859
kWh
- - - -
11 2.2414: Use waste heat from hot flue gases to preheat $3,300 $5,580 - - $3,300
-
MMBtu
- -
12 2.7135: Install occupancy sensors $241 $516 $241
2,798
kWh
- - - -
13 2.2437: Recover waste heat from equipment $1,072 $4,000 - - $1,072
-
MMBtu
- -
TOTAL RECOMMENDED $21,856 $12,545 $12,590
146,400
kWh
$1,391
-
kW-mo/yr
$7,544
-
MMBtu
$100 $231
TOTAL IMPLEMENTED $19,952 $11,548 $10,984
127,723
kWh
$1,093
-
kW-mo/yr
$7,544
-
MMBtu
$100 $231
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs