| Assessment Year | 1998 |
|---|---|
| Principal Product | Remanufactrued Electric Motors |
| NAICS |
n/a
|
| SIC | 3053: Gaskets, Packing, and Sealing Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 121 |
| Plant Area |
49,000
ft2
|
| Annual Production | 6,010
pieces
|
| Production Hrs. Annual | 6,656
hrs
|
| Location (State) | Rhode Island |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $64,132 | 741,794 |
kWh
|
$0.086 |
| Electricity Demand | $9,672 | 2,244 |
kW-mo/yr
|
$4.31 |
| Natural Gas | $58,520 | 7,591 |
MMBtu
|
$7.71 |
| Fuel Oil #2 | $700 | 129 |
MMBtu
|
$5.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,464 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,956 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $5,000 | $650 | - | - | - | $5,000 | |
| 02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $351 | $215 |
$351
4,103
kWh
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $157 | $181 |
$157
1,758
kWh
|
- | - | - | |
| 04 | 4.821: Pay bills on time to avoid late fees | $392 | - | - | - | $392 | - | |
| 05 | 4.652: Replace existing equipment with more suitable substitutes | $(-1,436.0) | $815 |
$392
4,689
kWh
|
$(-1,828.0)
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $4,464 | $1,861 |
$900
10,550
kWh
|
$(-1,828.0)
-
MMBtu
|
$392 | $5,000 | ||
| TOTAL IMPLEMENTED | $3,956 | $1,465 |
$392
4,689
kWh
|
$(-1,828.0)
-
MMBtu
|
$392 | $5,000 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs