ITAC Assessment: MA0409
ITAC logo
ITAC Assessment: MA0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Remanufactrued Electric Motors
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area 49,000
ft2
Annual Production 6,010
pieces
Production Hrs. Annual 6,656
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,132 741,794
kWh
Electricity Demand $9,672 2,244
kW-mo/yr
Natural Gas $58,520 7,591
MMBtu
Fuel Oil #2 $700 129
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.652: Replace existing equipment with more suitable substitutes $5,000 $650 - - - $5,000
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $351 $215 $351
4,103
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $157 $181 $157
1,758
kWh
- - -
04 4.821: Pay bills on time to avoid late fees $392 - - - $392 -
05 4.652: Replace existing equipment with more suitable substitutes $(-1,436.0) $815 $392
4,689
kWh
$(-1,828.0)
-
MMBtu
- -
TOTAL RECOMMENDED $4,464 $1,861 $900
10,550
kWh
$(-1,828.0)
-
MMBtu
$392 $5,000
TOTAL IMPLEMENTED $3,956 $1,465 $392
4,689
kWh
$(-1,828.0)
-
MMBtu
$392 $5,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs