Assessment Year | 2009 |
---|---|
Principal Product | Capital Equipment for Heat Exchanger Industry |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3542: Machine Tools, Metal Forming Types |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
250,000
ft2
|
Annual Production | 300
pieces
|
Production Hrs. Annual | 5,928
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $482,996 | 10,568,335 |
kWh
|
$0.046 |
Electricity Demand | $318,408 | 25,720 |
kW-mo/yr
|
$12.38 |
Natural Gas | $51,281 | 5,447 |
MMBtu
|
$9.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,558 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,412 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $37,050 | - |
$22,442
491,081
kWh
|
$14,608
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,706 | $19,921 |
$7,393
161,767
kWh
|
$6,313
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,516 | $100 |
$1,347
29,465
kWh
|
$1,169
-
kW-mo/yr
|
- | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $2,124 | $2,800 | - | - |
$2,124
-
MMBtu
|
|
05 | 2.7221: Lower temperature during the winter season and vice-versa | $1,656 | $500 | - | - |
$1,656
-
MMBtu
|
|
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,506 | $1,660 | - | - |
$1,506
-
MMBtu
|
|
TOTAL RECOMMENDED | $58,558 | $24,981 |
$31,182
682,313
kWh
|
$22,090
-
kW-mo/yr
|
$5,286
-
MMBtu
|
||
TOTAL IMPLEMENTED | $52,412 | $20,421 |
$29,835
652,848
kWh
|
$20,921
-
kW-mo/yr
|
$1,656
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs