ITAC Assessment: UM0351
ITAC logo
ITAC Assessment: UM0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Capital Equipment for Heat Exchanger Industry
NAICS 333517: Machine Tool Manufacturing
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 250,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 5,928
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $482,996 10,568,335
kWh
Electricity Demand $318,408 25,720
kW-mo/yr
Natural Gas $51,281 5,447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,412

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $37,050 - $22,442
491,081
kWh
$14,608
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,706 $19,921 $7,393
161,767
kWh
$6,313
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,516 $100 $1,347
29,465
kWh
$1,169
-
kW-mo/yr
-
04 2.7243: Improve air circulation with destratification fans / other methods $2,124 $2,800 - - $2,124
-
MMBtu
05 2.7221: Lower temperature during the winter season and vice-versa $1,656 $500 - - $1,656
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,506 $1,660 - - $1,506
-
MMBtu
TOTAL RECOMMENDED $58,558 $24,981 $31,182
682,313
kWh
$22,090
-
kW-mo/yr
$5,286
-
MMBtu
TOTAL IMPLEMENTED $52,412 $20,421 $29,835
652,848
kWh
$20,921
-
kW-mo/yr
$1,656
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs