ITAC Assessment: ORC001
ITAC logo
ITAC Assessment: ORC001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product outdoor recreational equipment
NAICS 451110: Sporting Goods Stores
SIC 5311: Department Stores
Sales Range less than $500
k
# of Employees 100
Plant Area 64,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,921 1,153,600
kWh
Electricity Demand $13,557 2,434
kW-mo/yr
Electricity Fees $1,519 -
Natural Gas $1,183 101
MMBtu
TOTAL YEARLY COSTS $73,180
RECOMMENDED SAVINGS* $14,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,145 $29,612 $8,969
183,049
kWh
$176
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $455 $1,200 $455
9,277
kWh
- -
03 2.7314: Reduce ventilation air $3,194 $300 $2,000
40,813
kWh
- $1,194
-
MMBtu
04 2.7241: Install outside air damper / economizer on hvac unit $1,439 $6,750 $1,439
29,374
kWh
- -
TOTAL RECOMMENDED $14,233 $37,862 $12,863
262,513
kWh
$176
-
kW-mo/yr
$1,194
-
MMBtu
TOTAL IMPLEMENTED $14,233 $37,862 $12,863
262,513
kWh
$176
-
kW-mo/yr
$1,194
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs