ITAC Assessment: MO0144
ITAC logo
ITAC Assessment: MO0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product fertilizer
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 445,985
ft2
Annual Production 216,081
ton
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $451,828 11,874,854
kWh
Natural Gas $430,467 223,012
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $20,780 $42,966 $20,780
601,407
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,196 $995 - $3,196
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $562 $95 $562
14,068
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,362 $7,895 $1,362
33,411
kWh
-
TOTAL RECOMMENDED $25,900 $51,951 $22,704
648,886
kWh
$3,196
-
MMBtu
TOTAL IMPLEMENTED $25,900 $51,951 $22,704
648,886
kWh
$3,196
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs